Brand logo
HomeGlobal MarketsSector DeepDivesCompany WatchMarket EntryData Stories
  1. Home
  2. /
  3. datastories
  4. /
  5. gen-ai-marketing-hype-cycle-first-wave

From +56.5% to -9.1%: A Practitioner's Playbook for Plotting gen AI Marketing Use Cases on the Hype Cycle

Short answer: the question "where is gen AI on the Hype Cycle?" is mis-asked, because "gen AI" is not one technology riding one curve; the usable method is to score every marketing use case on two axes — the adoption it has already accumulated, and the direction that adoption moved across the latest 12-month window — and then let those two numbers decide where next quarter's budget goes.

The method became far easier to run because a new report released by SAS this week, Marketers and AI: Navigating New Depths, lines up matched figures from 2024 and 2025 (n=300 for both years) across 10 gen AI applications. Three of them accelerated sharply, two moved backwards, and the gap between the two groups is the most operationally useful signal in the dataset. What follows turns that data into a working method: six steps, a decision grid, the traps that keep teams mis-plotting their own stack, and a 90-day checklist.

What does the Hype Cycle actually measure in a marketing stack?

Conclusion first: it measures collective expectation, not machine capability. Gartner's own methodology notes say so plainly — at the Trough of Disillusionment "interest wanes as experiments and implementations fail to deliver," while the Plateau of Productivity begins when "mainstream adoption starts to take off" (see Gartner's Hype Cycle methodology). Two tools with identical spend behind them can therefore sit on opposite halves of the curve, purely because buyers expected different things on announcement day.

Three acknowledgements make the curve usable rather than decorative.

1. "gen AI" is not a single technology. Asked whether it sits at the peak of inflated expectations, the trough, or the slope of enlightenment, the honest answer is "all of the above": each application and use case is somewhere else on the track.

2. Many applications are still first generation. Our expectations of a good AI-powered chatbot today are modest next to what we will expect of them in 2 years, 5 years, 10 years. A first-generation service bot gives accurate answers to relatively straightforward questions; a later generation may act on a customer's behalf and run cross-sell and upsell motions autonomously. Each generation will likely carry its own cycle of inflated expectations, disillusionment and enlightenment — so a company can be on "a" plateau with today's chatbots while a fresh, overhyped cycle opens for the next set of capabilities.

Visualising several generations, each on its own journey, is what lets a leadership team hold two opposing stages in mind at once — F. Scott Fitzgerald called that the test of a first-rate intelligence. An agent chatbot can be simultaneously at "a" Plateau of Productivity and at "a" Peak of Inflated Expectations. Or, more precisely, at one plateau and one peak among many over time.

3. The traversal is faster than before. A journey that once took a decade from trigger to plateau now happens in a couple of years, and the next generation's cycle starts before the current one levels off. Any map you draw has a shelf life.

What does the SAS data say about momentum versus maturity?

Conclusion first: momentum and maturity are separate readings, and in this dataset the fastest risers are also the most widely deployed. The chart that matters compares adoption against planning for 10 gen AI applications in marketing from 2024 to 2025 (n=300 in both years).

The 12-month acceleration in three use cases stands out:

  • Trends analysis: +56.5%
  • Chatbots/customer interactions: +44.2%
  • Generating text/copy: +32.4%

Those three accelerated leaders are also the three most adopted, albeit in a slightly different order:

  • Chatbots/customer interactions: 62%
  • Generating text/copy: 45%
  • Trends analysis: 36%

Two applications reversed direction over this past year:

Use caseChange in adoption
Generating video-9.1%
Customer journey mapping-4.3%

Two further readings from the same survey family frame what those swings mean. Coverage of the 2025 fieldwork in Martech records 85% of marketers actively using gen AI in 2025, up from 75% in 2024, and 62% claiming a strong understanding of the technology versus 50% a year earlier — evidence that the discipline is moving from experimentation into routine operations. The same coverage shows only 15% had fully integrated it into daily workflows, which is precisely the distance between a tool being adopted and an organisation being able to bank the value.

Those stats make it possible — with "a little hand waving" — to place each use case on the curve. The most adopted are on "a" Plateau of Productivity. The ones losing adoption, especially after much fanfare a year ago, belong in the "Trough of Disillusionment". The image at the top of this article is that approximation, for first-generation tools only.

One caveat worth repeating in any board deck: Gartner did not produce this map, and might be horrified by the use (or abuse) of the model. The placements are estimates drawn from the SAS report plus anecdotes collected across the martech community — a reading of the data, not a vendor census.

How do you plot your own use cases step by step?

Conclusion first: build the map from your own adoption ledger, not from vendor claims. Six steps take a marketing operations lead from blank spreadsheet to defensible positions.

  1. Open a use-case ledger, not a tool inventory. List the applications you actually run — copy generation, trend analysis, chatbots, video, journey mapping — and record what share of your campaigns each one touches. Vendor licences tell you spend; the ledger tells you adoption.
  2. Score level and direction separately. Copy the two SAS readings into your own columns: percentage of teams using it, and the change over the latest 12-month window. High level with flat direction is a plateau candidate; modest level with steep direction is a peak candidate that will disappoint someone within two quarters.
  3. Label the generation you bought. Write one sentence per use case on what first-generation software can genuinely do. For customer bots, today's honest ceiling is accurate answers to straightforward questions; anything involving autonomous action belongs to a later cycle and should be budgeted as an experiment.
  4. Convert saved hours into unit economics. Time returned is real but rarely self-funding: a bot that deflects a ticket the customer then re-opens elsewhere has cost you twice. Pair containment with resolution quality and follow-up rate before you call a use case productive.
  5. Stress-test the decliners before you cut them. Falling adoption can mean a failed category or a failed first version. Ask whether the drop came from output quality, integration friction, or a workflow that was never yours to automate — each answer implies a different action.
  6. Re-draw every two quarters. Because cycles are compressing, a map built from last year's data is a historical artefact. The re-plot takes an hour once the ledger exists, and it is the cheapest way to catch a use case sliding off the peak.

Which first-generation use case deserves the next budget?

Conclusion first: fund where the data shows plateau behaviour, and treat the trough as a rebuild instruction rather than an exit. The grid below applies the SAS readings to buying decisions.

Use case (first generation)Adoption / changeCurve positionPractical move
Chatbots / customer interactions62%Plateau for straightforward answersStandardise, integrate with the service record, price per resolved issue
Generating text / copy45%, +32.4%Late slope heading to plateauScale with brand and factual guardrails; measure rework rate
Trends analysis36%, +56.5%Fastest riser, still earlyPair with an analyst owner; treat outputs as hypotheses, not decisions
Generating video-9.1%Trough after a year ago's hypeHold spend; re-test when edit-level control and rights clear up
Customer journey mapping-4.3%TroughKeep the map, replace the tool: this is a data-foundation problem

What are the mistakes that make the curve look wrong?

  • Reading one curve for many technologies. A single verdict on gen AI is unfalsifiable; the useful verdicts are per use case and per generation.
  • Confusing buying volume with maturity. Adoption of 62% for chatbots says a category is settled, not that your deployment works; only 15% of surveyed marketers had fully integrated the technology into daily workflows.
  • Assuming pilots that launch will produce value. The MIT NANDA State of AI in Business 2025 report, as summarised by Fortune, found roughly 95% of enterprise gen AI pilots delivered no measurable return while a small integrated minority captured most of the value — the reported cause was workflow fit and governance, not model quality. Expectations, not capability, are what the trough is measuring.
  • Measuring deflection instead of resolution. Containment and resolution are different numbers, and a bot can look excellent on one while failing on the other (see the metric distinction at fin.ai). Vendors publish wide benchmark ranges; treat any single containment figure as marketing until you can audit the session transcripts.
  • Buying new point tools before the data is usable. Ariel Kelman of McKinsey argues that gen AI adoption so far is heavier in service and sales than in marketing, and that practitioners should first switch on the gen AI features already embedded in the SaaS applications they pay for while getting their data organised — a cheaper way to reach the plateau than a new category of software. Independent reviews of 2025 forecasts, such as Georgia Tech's grade card, reach a similar conclusion from the other direction: adoption advanced, but the hype outran the reality.

What does the same report reveal about the adopter-versus-observer gap?

Conclusion first: the spread inside a single cohort is wider than the headline average, and that spread is where budgets should be planned. SAS and Coleman Parkes segment the market into three maturity groups — Adopters already using agentic AI, Planners intending to, and Observers watching from a distance. The gap is visible even on far-out topics: half (50%) of the agentic AI adopters have already put quantum computing into a digital or innovation roadmap, compared with 25% of Observers, according to SAS's release on the study. Reported return on gen AI investment sits at 83% across the base but 98% among adopters, while 93% of teams carry dedicated 2025/2026 budget.

For a planning team the lesson is concrete: benchmarking yourself against "85% of marketers use gen AI" hides the real competition, which is the 15% who integrated it. Ask instead which side of that divide your reporting line sits on, and what the missing step is — data access, ownership, or an integration that survives contact with production.

What should you do in the next 90 days?

  • Days 1–30: build the use-case ledger for the 10 applications in the SAS frame; record level and 12-month direction for each; flag every tool whose business case rests on a capability that belongs to a future generation.
  • Days 31–60: pick one plateau use case to standardise (chatbots or copy) and one trough use case to rebuild from the data layer up; switch on embedded gen AI features in existing SaaS contracts before evaluating new vendors.
  • Days 61–90: publish per-use-case metrics that pair containment or hours saved with resolution quality, rework and cost per outcome; re-plot the curve and put the two decliners back to a documented kill-or-retest decision.

FAQ: plotting gen AI marketing use cases on the Hype Cycle

Is gen AI at the peak of inflated expectations or the trough of disillusionment?

Both, and neither. The correct unit of analysis is the use case and its generation: chatbots and text generation behave like plateau technologies in the SAS data, while video generation and journey mapping lost adoption over this past year.

Which numbers should a marketing team copy from the SAS report?

The pairing, not the rankings. Adoption level (62%, 45%, 36%) tells you whether a category is settled; the 12-month change (+56.5%, +44.2%, +32.4%, -9.1%, -4.3%) tells you which direction it is travelling.

Why did the report sample stay at n=300 across 2024 and 2025?

It is a matched-sample global survey of marketing decision-makers run for SAS by Coleman Parkes Research, which lets year-over-year movement be read directly. Small n means the percentages are directional; treat a one-point change as noise and a double-digit swing, like +56.5%, as a signal.

Should a company stop investing in the declining use cases?

Not automatically. A trough is where first-generation products disappoint and second-generation products get built — which is why F. Scott Fitzgerald's line about holding two opposing ideas is so useful here. Keep the outcome, re-test the tool, and fix the data foundation before buying again.

Where to verify the numbers in this piece

  • SAS, Marketers and AI: Navigating New Depths (full report, 10 applications, n=300): sas.com PDF
  • SAS press release on the agentic AI divide between Adopters, Planners and Observers: sas.com
  • Martech coverage of the 2025 survey findings: martech.org
  • Gartner Hype Cycle methodology and stage definitions: gartner.com
  • MIT NANDA State of AI in Business 2025, via Fortune: fortune.com
  • McKinsey on gen AI in marketing and sales: mckinsey.com

Prepared by Marc Hale for the GlobalBizSight DataStories desk. Questions about our data coverage: info@globalbizsight.com.

Brand logo

Global Biz Sight

Global business intelligence — turning scattered data into clear, actionable decisions.

Global MarketsSector DeepDivesCompany WatchMarket EntryData StoriesGlobal SaaSManager

© 2026 GlobalBizSight.

Cookie Notice

We use cookies to improve your experience and analyze website traffic. Read our Privacy Policy to learn more.