Short answer: cellular IoT's slower connection growth is a hardware signal, not a demand verdict. The installed connection base and annual module shipments no longer move on one curve, and Cat.1bis, LTE-M, NB-IoT and RedCap now answer different device jobs. Public evidence still does not describe one modem family that can serve a deep-sleep meter, a roaming terminal and a 5G standalone camera on a single antenna plan and a single certification route.
Read on a ten-year clock, what is ending is not demand but a phase. For most of the last decade one network generation absorbed almost every connected device type, so a product roadmap could be written as a slogan. The sector is now layering device classes instead of replacing them, and the layering shows up first in shipping and radio-frequency behaviour, not in headlines. The framework below follows that sequence: the drivers behind the split, the competitive landscape of device tiers, and the tests a product or procurement team should run before design lock.
Conclusion first: connection growth stayed in double digits but fell to its slowest pace in five years, while hardware volumes and revenue kept rising for reasons that are not the same. That mismatch is the actual signal.
IoT Analytics's tracking, reported by Sohu, says global cellular IoT connections reached 4.7 billion by the end of 2025 and grew 13% year over year, the slowest rate in five years, with the drag attributed to slowing China demand. IoT Analytics's own market update puts the same year at 13.3% growth, and Mordor Intelligence's sector page cites the 4.7 billion connection base alongside module shipments of 612 million units. Ericsson's IoT connections outlook page carries a different base figure of around 4.5 billion at the end of 2025. Two reputable trackers separated by roughly 200 million connections on the same question is not noise: it is a reminder that a single growth number rarely defines a market layer.
Hardware flow is moving again in a different direction. IoT Analytics reports cellular IoT module shipments rose 15% year over year in H1 2026, led by 34% growth in Cat 1 bis, with memory costs pushing average selling prices back into growth. Berg Insight counts 612 million cellular IoT modules shipped in 2025, up 33%, and module revenue up 19% to US$5.6 billion. A base of connections that grows at 13% with a shipment stream that grows at 15-33% describes replacement timing and richer device content, not a single market breathing in one rhythm.
Conclusion first: the mix inside one year is the evidence. A market that was converging would show one class rising while another fell smoothly. What the data shows is several classes re-pricing at once.
An OFweek report citing Counterpoint says 2024 global cellular IoT module shipments rose 10%, while Cat.1bis shipments rose 100% and NB-IoT shipments fell 34%. One calendar year therefore held strong growth in one LTE class and a steep decline in another. That pattern is hard to explain as a clean migration from one generation to the next; a buyer can watch a low-power class lose unit momentum while a mid-speed LTE class expands quickly.
The same caution applies to the previous year. Industry tracking compiled by 物联网智库 notes that 2023 produced the first annual decline in global cellular IoT module shipments, at -2% on Counterpoint's methodology and about -18% on IoT Analytics's, with revenue down 11%. Those numbers are not wrong; they count different things. Anyone building a three-year component plan off one percentage point is betting on a survey boundary rather than on demand.
Cat.1bis growth may reflect different replacement timing or price points, and the NB-IoT decline may reflect network and cost conditions. The 13% connection growth and 10% module shipment growth describe different layers: installed connections versus annual hardware refresh. Long-run forecasts keep growth in view without collapsing it into one standard. A Cnyouke summary of an Omdia report expects cellular IoT connections to reach 5.1 billion by 2030 and says 5G RedCap is accelerating, while an Ericsson Mobility Report outlook says cellular IoT connections are expected to approach 8 billion by the end of 2031. Both support a larger device base, and neither says how many endpoints will need LPWA sleep, how many need LTE roaming, and how many need 5G standalone throughput.
Conclusion first: the modem is not a line item, it is a system owner. Electronicseng's RF comparison frames the modem decision as a system problem, and that framing is what turns market mix into engineering work.
Cat.1bis runs on normal LTE infrastructure and keeps nominal 10-Mbps downlink and 5-Mbps uplink rates while using a single receiver antenna path. That configuration can help global or roaming devices that need broad LTE coverage without the antenna cost of two receive paths. LTE-M and NB-IoT - the two low-power wide-area (LPWA) classes, meaning radios that trade raw data rate for narrower bandwidth, coverage enhancement and low standby drain - fit endpoints that sleep most of the day and send small packets. The decline in NB-IoT module shipments leaves the LPWA function in place. It shows buyers have several viable categories and that some applications shifted toward Cat.1bis for cost or coverage reasons.
RedCap occupies another tier. The Electronicseng article describes it as a 3GPP Release 17 reduced-complexity device, limited to 20 MHz bandwidth in FR1 and without carrier aggregation, and notes it depends on 5G standalone (5G SA) network support and a Global Certification Forum (GCF) path. It is a 5G NR class built for workloads needing more throughput or lower latency than LPWA, in places where the network and the certification route are known.
Power modes differ enough to change product definition. A device that sleeps deeply values coverage enhancement and narrow bandwidth. A device that streams alarms or images values uplink behaviour and latency. A device that roams values band lists and certification. A device inside one factory may trade broad coverage for 5G standalone density. Band behaviour is where a common roadmap strains: the article ties modem choice to deployment geography, operator support, service life and antenna trade-offs, including bands in the 600 to 960 MHz range and Sub-6 GHz operation, and describes GCF RedCap milestones and Release 18 eRedCap timing in early 2027.
The practical effect appears at board level. A replacement module may carry the same nominal class, the same connector and a lower price, yet different supported bands, receive paths or certification status can change antenna placement, PCB tuning, housing and regulatory testing. That is the point at which a modem substitution stops being a purchasing decision and becomes a qualification project. IoT Business News's summary of tailored connectivity makes the same argument at market level: scalable IoT deployments benefit when connectivity choices match the job, and generic connectivity falls short when projects assume one configuration fits all.
Conclusion first: RedCap is a geography decision before it is a technology decision, because the operator base that can actually carry it is still narrow. GSA reported 30 operators in 21 countries and territories investing in RedCap in its April 2025 snapshot, rising to 34 operators in 24 countries by its autumn update, with early commercial launches by T-Mobile in the US and operators in China. In the same period GSA counted 154 operators in 63 countries investing in 5G standalone, out of roughly 644 operators it had identified investing in 5G by the end of July 2025. Ericsson's outlook page notes RedCap had been launched by 14 service providers. The funnel matters more than any single number: several hundred operators building 5G, a smaller set running 5G SA, and a thin layer with commercial RedCap today.
Standards activity reinforces layering rather than convergence. The 3GPP ecosystem work described in its Release 18 item on enhanced support for reduced-capability NR devices - the eRedCap class - is positioned by industry descriptions at roughly 10 Mbps peak rates with a 5 MHz device bandwidth, which is the operating space that LTE Cat 1 and Cat 1 bis occupy today. Ericsson's December 2024 engineering blog frames the RedCap triangle the same way: use cases that need lower device cost and longer battery life than legacy 5G NR. That is a new tier being added under an existing tier, not one platform absorbing the field.
The case that shows the split most clearly is consumer wearables, where RedCap is moving from industrial pilots into volume. C114's August 2026 industry report describes RedCap shifting from "industrial necessity" toward consumer scale, with adult smartwatch shipments reaching 5 million units in 2025 and forecast above 10 million in 2026. A wrist-worn device needs mid-speed throughput, voice or video, licensed-band roaming and a battery measured in days; a water main sensor needs a decade of sleep current and deep indoor coverage. Both are cellular IoT. Neither should inherit the other's radio plan, and a shared bill of materials built on the category label is where those two products collide.
The strongest case for one upgrade path is more substantial than a hope that the market returns to a single growth curve. It says scale, module integration and 3GPP standardisation should reduce fragmentation. Market Research Future places the cellular IoT market at USD 7.10 billion in 2025, USD 8.68 billion in 2026 and USD 47.90 billion by 2035. Mordor Intelligence projects a rise from USD 9.34 billion in 2026 to USD 25.71 billion by 2031 at a 22.45% annual rate. IoT Analytics's module and chipset tracker says cellular IoT modules and chipsets grew 23% year over year in Q1 2025. Those numbers support a large revenue opportunity and suggest vendors have enough scale to push multi-mode, simplified roadmaps.
That argument carries real commercial weight and stops short of RF equivalence. Growth forecasts measure dollars and units; they leave the radio question open - can one antenna and one certification plan serve a meter that sleeps for years, a payment terminal roaming across LTE bands and an industrial camera needing 5G standalone throughput? The Q1 2025 module and chipset growth can sit beside slower connection growth precisely because endpoints are becoming richer, more specialised or higher value. A larger market can require more different parts, not fewer.
The second part of the common-roadmap case is procurement cost, and it is genuine: more module variants mean more forecasts, more band lists, more certification packages and more inventory. It becomes the cheaper-sounding but costlier answer when a common module forces redesign, antenna tuning, battery changes or late certification failures. Electronicseng's RedCap timeline is the caution to keep on the desk - Release 18 eRedCap is described in early 2027, and RedCap depends on 5G standalone deployment, GCF steps and product RF choices. A buyer waiting for a future single chip may pay today in redesign risk.
Multi-mode modules can remove some selection pain, since a chip supporting several standards may lower firmware fragmentation. The RF consequence remains: supported bands, receive paths, power modes and the test plan still have to match the final product. Multi-mode capability is useful when the product can commit to one behaviour; it is weaker when a design assumes every mode will perform like the one selected during specification.
The condition that would overturn this judgement is testable. If one modem family later serves low-power endpoints, global LTE roaming devices and 5G standalone workloads with acceptable battery life, stable band coverage, mid-speed latency, low cost and one certification path, then a common platform deserves support. Today that condition remains unmet in the public evidence.
| Device class | Optimised for | Question to answer before design lock | Typical failure mode |
|---|---|---|---|
| Cat.1bis | Broad LTE coverage and roaming on one receive path, nominal 10 Mbps downlink / 5 Mbps uplink | Is wide geographic band coverage needed more than minimum sleep current? | Chosen for headline rate, then battery and antenna budget fail in the field. |
| LTE-M or NB-IoT | Coverage enhancement, narrow bandwidth, deep sleep, tiny packets | Can the endpoint tolerate small payloads and long sleep intervals? | Application grows toward video or alarms and the class is replaced mid-programme. |
| RedCap (Release 17) | 5G NR mid-speed tier, 20 MHz in FR1, no carrier aggregation | Is 5G SA coverage confirmed at every deployment site, and is a GCF route available? | Bought on roadmap language while the operator footprint is not yet there. |
| eRedCap (Release 18) | Lower-cost NR tier described near 10 Mbps and 5 MHz | Can the product tolerate the early 2027 certification timing in the launch window? | A calendar that assumes "5G is 5G" and lands redesign risk in year one. |
A segmented approach is manageable if it is run as one disciplined selection process rather than as an expanding part number list. Product teams should record duty cycle, packet size, sleep interval, target regions, operator mix, required latency and battery life before choosing a modem class, then run the following sequence:
No. Connections reached 4.7 billion by the end of 2025 and grew 13% year over year; what changed is the pace and the mix, with module shipments rising 10% in 2024 while one LTE class doubled and an LPWA class fell 34%.
Not yet, and probably not in the way the label suggests. RedCap is a Release 17 5G NR class limited to 20 MHz in FR1 without carrier aggregation and dependent on 5G standalone coverage, while Release 18 eRedCap adds a lower tier described around 10 Mbps, with certification timing placed in early 2027.
It makes them a contested one. The LPWA function survives; part of its application base moved to Cat.1bis on cost or coverage grounds, which is a signal about price points and network behaviour, not about the end of deep sleep.
As many as it has device roles, and no more. The control mechanism is one selection process and one qualification file, so that adding a class does not mean duplicating forecasts, band lists and certification packages without an owner.
Published evidence that one modem family covers deep-sleep endpoints, LTE roaming devices and 5G standalone workloads on a single antenna plan, one certification route and an acceptable battery budget. Absent that, segmentation is the lower-risk engineering position.
For the decision layer, the takeaway is narrow and durable: price the modem against the antenna system and the certification calendar it commits you to, not against the generation label on the datasheet - the slowdown did not create the fragmentation, it only removed the excuse for ignoring it.