Brand logo
HomeGlobal MarketsSector DeepDivesCompany WatchMarket EntryData Stories
  1. Home
  2. /
  3. sectordeepdives
  4. /
  5. one-claim-per-tonne-gulf-ccs-accounting-line

Two Ledgers, One Tonne: A Decision Framework for Gulf CCS Pledges Before COP31

By Felix Allen, Enterprise Technology Advisor, GlobalBizSight

One physical tonne of CO2 is currently fit to serve two carbon budgets at once: once in a Gulf reservoir's capture ledger, once in an importing country's inventory. Until a registry with treaty-grade authority makes claims exclusive from wellhead to stack, producer pledges should keep the two ledgers apart and print any netting on the cover. This piece compares the separation and netting camps on boundaries, costs and auditability, and turns that comparison into a decision framework.

The tension is no longer theoretical. Analysts frame COP31, formally the 31st Conference of the Parties to the UN Framework Convention on Climate Change, as the moment carbon management comes of age — the pattern of declarations outrunning verifiable infrastructure runs across the whole COP31 agenda. Into that drafting season, as one widely-read energy news roundup reported, "Exxon Mobil filed a confidential challenge to the European Union's carbon capture rules." Whatever that filing argues, it targets the same boundary questions a producer pledge must answer: whose tonne is a captured tonne, and who may subtract it.

Why can one captured tonne not serve two ledgers?

The conclusion first: the same physical molecule can be booked against a producer's Scope 1, a customer's Scope 3 and a sovereign inventory simultaneously, and no multilateral registry currently stops the overlap. A tonne is a unit of account as much as a unit of mass, and units of account need a single owner.

For a fuel exporter the difficulty is mechanical. Scope 1 covers emissions a company releases directly, at wells, processing trains and reservoirs it operates; Scope 2 covers purchased energy. Scope 3 covers the value chain, where for a producer the dominant entry is use of sold fuel: tonnes that burn in jurisdictions which count those same physical molecules in their own national inventories. Capture at a reservoir shrinks Scope 1 and leaves the customer's tonne untouched. A pledge that nets the two borrows from a ledger someone else maintains, and readers of the pledge usually cannot tell whether anything was reduced once or counted twice.

A teaching entry on carbon capture in Bohrium's science encyclopedia uses a bathtub: a plant fitted with source capture narrows the water flowing in, while direct air capture opens a drain. Both help manage the level, and the entry insists that climate accounting keep gross emissions and gross removals distinct, because they are different physical acts.

The accounting literature for bioenergy with carbon capture, summarized on aiwiki.page, is stricter still. It separates three quantities that blur easily in corporate material: gross captured, what a facility strips out; net removal, after subtracting supply-chain energy, conversion, transport and storage emissions; and avoided emissions, which come from displacing a dirtier alternative and do not by themselves mean carbon already in the air came down. The same literature requires compatible system boundaries, tonnes of CO2 equivalent throughout, and methane and nitrous oxide reported separately, because their warming effect depends on the timescale chosen. A producer ledger that never says which of the three quantities it reports is unreadable by design. Methane lost along a supply chain stays invisible to a CO2 capture claim, however large the claim.

Practitioners hit the same wall from the demand side. On a r/dataisbeautiful thread charting the state of CCS projects, one commenter put it this way: "The use case for CCS isn't (or at least shouldn't be) to offset the burning of fossil fuels." That is one person's opinion, flagged as such, but it tracks the accounting: capture reads cleanly against the operator's own stack and murkily against somebody else's exhaust.

How do the two camps compare on boundaries, costs and auditability?

The conclusion first: the real disagreements are parameters, not philosophies — where the boundary sits, who carries the full-chain cost, and who can verify the count. Each parameter can be settled by a named rule, which is why the table below reads as a decision aid rather than a scorecard.

DimensionSeparation campNetting campWhat breaks without a rule
BoundaryReservoir capture against own Scope 1; exported combustion as Scope 3 under a named methodOne consolidated figure nets capture against combustion liabilitiesGross captured, net removal and avoided emissions blur into one unlabeled number
CostFull-chain cost sits with the producer; combustion is already priced where it happensStorage revenue shared against combustion savingsFull-chain costs run $20-150 per tonne of CO2 today (Wood Mackenzie, via KAPSARC, August 2023); overruns need a named owner
AuditabilityEach claim checks against one operator's own stack and documentsClaims depend on a counterparty's regulator and a registry that does not existThe US EPA publishes only aggregate annual CCS statistics, so project-level checks already take creative methods
Claim exclusivityOne claim per tonne, netting disclosed on the coverNetting presumes a waived counterparty claimA borrowed tonne surfaces at the buyer's audit, after capital is committed

The industry's own checklist confirms where it locates the risk. Chinese industry outlet Tanjiaoyi reports global capture capacity of 68 million tonnes and relays the CCS Industry Development Report (2026), which lists what credibility requires: explicit project boundaries, baselines, full-lifecycle energy accounting, leakage monitoring, long-term liability arrangements, and monitoring, reporting and verification with traceable data. Every item is a boundary rule. For scale context, the Global CCS Institute's Global Status of CCS 2025 report counted 77 commercial facilities in operation with combined capture capacity of 64 Mtpa as of 28 July 2025, with a further 44 Mtpa under construction — meaningful growth, still small against either camp's ambitions.

Auditability is thin even inside well-regulated markets: Sam Leon's Datadesk account of a 2023 carbon capture investigation notes that the US EPA publishes only aggregate annual statistics on CCS, so reconstructing project-level performance took creative methods. A cross-border ledger netting exported combustion would be harder still to check from outside.

What can existing fuel policy and registries teach the Gulf?

The conclusion first: the one-claim-per-tonne rule is not a moral preference; it is operating practice in fuel policy and registry design today. Producers already work inside systems built on exactly this discipline.

Carbon-intensity regimes for fuels already push attributes upstream: California's Low Carbon Fuel Standard runs on the CA-GREET 4.0 model, Canada applies its Clean Fuel Regulations, European supply chains audit under ISCC EU schemes, and the US 45Z producer credit rests on attestation. Whatever one thinks of each scheme, they share a premise: a fuel carries its accounting identity from the field, and claims must trace back to documents. All four sit side by side on the working surface of Mangrove Systems, a carbon-accounting platform, alongside ISCC surveillance audit windows and CA LCFS quarterly fuel reports.

Double claiming is a mundane, well-documented failure mode. A Chinese analysis of metering for EV charging stations works through onsite solar that counts as avoided grid purchase on the emissions side and as a reduction on the credits side, and warns that the environmental right to that electricity can be claimed once. Its sharpest point, in my translation, is that unclear boundaries let extra meters compute the error more precisely. Cargo-size fuel trades raise identical questions at higher stakes.

Registries exist to enforce that once-ness. China's voluntary market issues CCER credits, short for China Certified Emission Reduction, and the registry's job is to keep a single verified tonne from serving two pledges. That machinery is domestic. The nearest international analogue is Article 6 of the Paris Agreement, under which countries can transfer credits and apply corresponding adjustments so a transferred tonne is counted once globally — but that machinery runs government to government. On the public material I reviewed, nothing equivalent spans a reservoir in the Gulf and a boiler in an importing market today.

The import side is moving the same direction, on a timetable. The EU's carbon border regime entered its definitive phase on 1 January 2026, and under its design a carbon price effectively paid in the country of production can be deducted from the certificates an importer must surrender — once-ness, enforced at the border, with the producing country's treasury as the intended beneficiary. The UK follows with its own border adjustment from 2027, using a single default value per product, as the GOV.UK factsheet sets out. A producer pledge that nets exported combustion unilaterally cuts against the grain of exactly the systems importers are building.

What does the Gulf ledger promise, and what can it not yet show?

The conclusion first: the economics explain the pull. Stored CO2 is being repositioned as an export-industry asset, and netting it against combustion liabilities converts storage into balance-sheet room. That is a rational motive — which is precisely why it needs disclosure discipline.

A May 2025 analysis at Gulf International Forum argues the region can push CCS costs down substantially by 2050, building on hydrocarbon expertise and low labor and land costs. An Oil and Gas Climate Initiative assessment of Gulf deployment puts the combined upside from hydrogen exports and CCUS at $15-44bn in gross value added in 2050, with support for between 87,000 and 245,000 jobs. The Wood Mackenzie cost work points the same way: the global full-chain range of $20-150 per tonne sits at its low end in the Gulf, where geology, energy and labor costs are favorable. Numbers like these turn stored CO2 into an export-industry asset.

The physical scale is still modest against that ambition — 68 million tonnes of global capture capacity per Tanjiaoyi, 64 Mtpa operating per the Global CCS Institute. And note what the credibility list from the CCS Industry Development Report (2026) actually is: boundaries, baselines, lifecycle accounting, leakage monitoring, liability, traceable MRV. When an industry defines credibility entirely as boundary discipline, a pledge that blurs boundaries is swimming against its own current.

Where is the netting camp right?

The conclusion first: treating producer netting as paperwork games would be lazy. The serious version has four planks, and each one concedes more than it asserts.

Plank one: combustion is already priced where it happens, through excise, carbon pricing and efficiency rules in importing markets, so charging producers for the same physical tonnes again would double-tax one event and fund no extra abatement. Plank two: responsibility can move by contract, using the exclusivity logic registries already apply; extend it across a bilateral corridor and netting becomes a documented transfer with a named owner. Plank three: refusal has a price too — if importers decline recognition wholesale, capture capacity sized on the OGCI outlook loses its revenue logic, and storage that would physically happen may not. Plank four: skeptics are loud as well; an r/energy commenter has argued that CCS is a poor idea on its own terms because capture reduces a power plant's efficiency quite significantly, and piling accounting games onto contested hardware strengthens that critique.

Now the concessions. Contractual transfer presumes both registries recognize the same tonne moving, and no multilateral registry with that authority covers exported fuel today, so a pledge that nets is recording a claim no counterparty has waived; the borrowing becomes visible when a buyer's regulator audits. Fuel carbon-intensity regimes already hand producers defined upstream lanes with attestation duties attached, so producers face ambiguity more than exclusion. The efficiency critique lands on plant economics and leaves the disclosure question standing. Where the two camps actually disagree is sequencing — who books the tonne first — and sequencing can be settled contractually, cargo by cargo, without touching the global arithmetic. Disclosure costs a producer nothing except the temptation.

The producer objection to strict fence-line accounting even has a working prototype. In an interview relayed by CCA Digital Cement Network, an industry representative laid out the Global Cement and Concrete Association's position: report emissions inside the plant gate, treat what leaves embedded in a product as part of the global total outside the plant's direct accounts, and accept that a plant will decline expensive capture investment if it still carries the liability after the gate. Swap cement for crude and the logic runs close to word for word what a Gulf producer says about exported barrels. The position holds together, and its limit shows up in the economics.

What do decision-makers keep getting wrong about CCS claims?

The conclusion first: most disputes in this space recycle four misconceptions, and each has a specific correction.

  • "Capture at a reservoir reduces the buyer's emissions." It does not. It shrinks the operator's Scope 1; the customer's combustion tonne sits untouched in the customer's inventory unless a registry-recognized transfer moves it.
  • "A large capture number covers methane too." It does not. Methane and nitrous oxide belong on their own lines, because a CO2 capture claim says nothing about either, and their warming effect depends on the timescale chosen.
  • "Double charging means double abatement." Charging both the combustion site and the producer for one physical event funds no extra abatement; it just reallocates a bill. The remedy is a named rule on who pays, not silence.
  • "International registries already handle this." Article 6 corresponding adjustments work at government level; CCER-style registries are domestic. No treaty-grade registry yet spans a Gulf reservoir and an importing market's boiler.

When would this two-ledger position be wrong?

Stating my falsifiers plainly. The separation position fails if a treaty-grade process, beginning at COP31 or after it, creates a registry with exclusive claims and verified custody from wellhead to stack, and importing jurisdictions formally waive their inventory share for transferred tonnes; at that point netting is a disclosed transfer and separate covers add nothing. It weakens if producer states accept capped, priced liability for exported combustion with both sides booking the same number, because then separation is paperwork. Neither condition is visible in the public material available to me, and whether COP31's agenda touches this ledger question at all is, on that same material, unclear. Until one arrives, the condition under which cover-page disclosure earns its keep is precisely the one this sector is in: ambitious headline numbers, missing public ledgers.

What should a producer actually do this drafting season?

The conclusion first: the working list is ordered by cost of compliance, from free to expensive. A pledge can be drafted down it without waiting for COP31.

  1. Book reservoir capture against your own Scope 1, and state whether the figure is gross captured or net of the energy the capture chain consumes.
  2. Report exported-fuel combustion as Scope 3 under a named method, even where the number is an estimate with a stated range.
  3. Put methane and nitrous oxide on their own lines, since a CO2 capture claim says nothing about either.
  4. If any tonne is netted across the production-to-combustion line, print the netting, the counterparty and the claim owner on the cover page.
  5. Fund leakage monitoring and long-term liability before selling any credit; under the 2026 industry checklist these are the items that decide whether a tonne survives audit.

Importers owe the mirror image: score upstream intensity on delivered fuel and decline netting that no registry vouched for. The border-regime timetable — the EU's definitive phase since 1 January 2026, the UK's from 2027 — shows importers are already pricing upstream identity into trade. That discipline costs less than the dispute Exxon Mobil has opened in Europe.

Which questions do readers actually ask about this?

Whose tonne is a captured tonne in a cross-border fuel trade?

Physically it belongs to whichever stack released it; legally it can be claimed once, by whoever holds a registry-recognized right. Today that right is normally domestic. Absent a recognized transfer, capture at a reservoir supports the operator's Scope 1 claim only.

Is netting capture against exported combustion always illegitimate?

No. It becomes legitimate the moment a counterparty waives its claim through a registry with exclusive-claim authority — which exists for government-to-government transfers under Article 6, but not yet for exported fuel. Until then it is an undisclosed borrowing.

Does CCS make imported fuel cheaper or cleaner for the buyer?

Cleaner only if the claim structure is airtight; cheaper only if storage revenues are netted in. On today's cost data of $20-150 per tonne full-chain, with the Gulf at the favorable end, neither effect is automatic — it depends on contracts and disclosure.

What single disclosure would make a Gulf pledge more credible?

The cover-page line: what quantity was captured, gross or net, who owns the claim, and whether any tonne was netted against exported combustion, with the counterparty named. It costs nothing and answers the audit question before it is asked.

References

  • Energy news roundup: Guterres's final climate warning and Exxon Mobil's EU challenge
  • Bohrium Sciencepedia: Carbon capture and storage
  • aiwiki.page: Bioenergy with carbon capture and storage
  • r/dataisbeautiful: The current state of carbon capture and storage projects
  • Mangrove Systems
  • Chinese analysis: the metering logic of carbon accounting for EV charging stations
  • CCA Digital Cement Network: International cement dialogue, issue 17
  • Gulf International Forum: The Gulf States' Carbon Capture and Storage Ambitions (May 2025)
  • OGCI: CCUS deployment challenges and opportunities for the GCC
  • Tanjiaoyi: global capture capacity reaches 68 million tonnes; CCS Industry Development Report (2026)
  • Datadesk: How we investigated a carbon capture flop (2023)
  • r/energy: What is your opinion on carbon capture and storage?
  • Global CCS Institute: Global Status of CCS 2025
  • KAPSARC: Carbon Capture and Storage Cheaper in Gulf (Wood Mackenzie cost range, August 2023)
  • World Bank: What you need to know about Article 6 of the Paris Agreement
  • GOV.UK: Carbon border adjustment mechanism factsheet
Brand logo

Global Biz Sight

Global business intelligence — turning scattered data into clear, actionable decisions.

Global MarketsSector DeepDivesCompany WatchMarket EntryData StoriesGlobal SaaSManager

© 2026 GlobalBizSight.

Cookie Notice

We use cookies to improve your experience and analyze website traffic. Read our Privacy Policy to learn more.