As accelerator capacity shifts from single-supplier cabinets to assembled systems, the real buying question is no longer whether a rack interoperates, but who can rebuild, sign, patch and validate it when the original design authority can no longer act. On the evidence reviewed here, an interconnect claim earns continuity credit only if auditable second-source escrow of firmware, configuration and toolchain sits behind it, under a tested release trigger. Three failures from 2022 to 2026 make that rule concrete, and all three happened in industries that thought they already owned the asset.
Short answer: ownership of hardware never included ownership of the service loop wrapped around it. The Nord Stream 1 compression turbines were built by Siemens Energy and had to travel back to Siemens Canada's plant in Montreal for routine maintenance. When Canadian sanctions on servicing Russia's oil and gas sector blocked that work, pipeline flows were cut, and gas movement stopped completely on 2 September 2022, with the operator pointing to the absent turbines. Ottawa granted a two-year exemption on 9 July 2022 so one unit could return; the Russian operator refused to take it without a guarantee that future maintenance would stay possible. On 14 December 2022 Canada revoked the exemption, and serviced units remained in Montreal. Reporting by the Canadian Broadcasting Corporation and the Oxford Institute for Energy Studies shows the mechanism plainly: one OEM workshop, one jurisdiction, one legal channel — and a buyer who could own the machine but not the right to keep it running.
Copy the shape, not the commodity. A signed firmware image, a proprietary rack controller and a vendor validation suite are the turbine workshop of AI infrastructure. The dependency is never the part itself; it is the only route through which the part can be repaired.
Because it proves that continuity is a separable product. Windows 10 reached end of support on 14 October 2025. Microsoft's published commercial Extended Security Updates pricing runs at $61 per device for the first year and $122 for the second, with later years cumulative and eligibility tied to a specific build (22H2). Nothing about the hardware changed on that date; only the vendor's willingness to sign new code did. Details are in Microsoft's ESU documentation.
The rack version of this event does not announce itself. It arrives when a supplier is acquired, exits a region, loses a certification, or simply stops answering patch requests for an interconnect component that is one node among thousands. If the deposit in the contract cannot be rebuilt and signed under those conditions, the buyer is negotiating with the vendor's pricing department rather than operating an asset.
The UK Competition and Markets Authority published the final report of its cloud services market investigation on 31 July 2025, finding evidence of limits to effective competition in UK cloud infrastructure services. On 31 March 2026 the regulator announced a package of actions: material steps by Microsoft and Amazon on interoperability and data egress fees, in place of a strategic market status investigation into cloud infrastructure, alongside an investigation opened into Microsoft's business software ecosystem (see gov.uk and the case page).
Read the remedy inventory carefully. Switching friction, egress pricing and interface access were all addressed. Nobody ordered the stack to be rebuildable by a third party. That gap is the argument for treating certification, vendor support agreements and escrow tests as three separate checks rather than one assurance category. MarketsandMarkets sizes the data center certification market at $0.99 billion in 2025 and $1.16 billion in 2026, small against AI capacity forecasts, which suggests the practice is still shallow. A certificate proves conformance at a point in time; only a rebuild test shows whether a repair path survives a change in vendor status.
Capacity and spending forecasts point the same direction on different definitions. JLL projects the data center sector to add 97 GW between 2025 and 2030, effectively doubling over five years. Grand View Research puts the AI data center market at $147.3 billion in 2025, $180.6 billion in 2026 and $810.6 billion by 2033, a 23.9% compound annual rate. MarketsandMarkets uses a broader scope and forecasts growth from $471.59 billion in 2026 to $2,023.52 billion by 2032 at 27.5%.
The connective tissue scales on its own curve. Mordor Intelligence values data center interconnect at $18.62 billion in 2026 and $42.45 billion by 2032 at 14.73%, while TechSci Research traces a similar path from $17.45 billion in 2025 to $35.41 billion by 2031 at 12.52%. The spread between firms does not settle definitions, but it does show the same operational fact: more rack parts are being bought, integrated and supported across more companies at once. A rack becomes a system of record for one integration team and a support boundary for many others.
The collaboration around Rebellions, NVIDIA and SK Telecom gives the abstraction a body. ItInsightsWorld states, “A joint effort by NVIDIA, Rebellions and SK Telecom is intended to move Korea’s sovereign AI infrastructure forward.” The same report says Rebellions will connect its Rebel R200 neural processing units to the NVIDIA platform through NVLink Fusion, use NVIDIA MGX rack architecture, and be supported in deployment by SK Telecom with backing from the Ministry of Science and ICT. R200 is described as built for low-latency, energy-efficient inference with frontier models, including multitrillion-parameter mixture-of-experts models, with deployment placed around 2028 — a timeline echoed in NVIDIA's own announcement of the partnership.
Two dates frame the risk. NVLink Fusion was unveiled on 18 May 2025 as a route for industries to build semi-custom AI infrastructure with a partner ecosystem, per NVIDIA's release. Deployment is expected around 2028. Between those dates, custom silicon, a scale-up interconnect description, a rack architecture and a national operator are being fused into one install base that will outlive several supplier relationships. Our earlier read of MGX openness, measured through rack power and delivery dates, lands on the same seam: parts entering a rack is a mechanical fact; operating them is an information question.
The sovereign label sharpens rather than softens the support problem. The report says the collaboration aims to enable AI services shaped by Korea's language, industries and priorities. Those services depend on processor supply, rack operation and cluster availability at the moment a silicon designer, interconnect owner, rack integrator or cloud operator cannot act. A state or operator can buy hardware; buying hardware does not automatically buy the right to maintain every software layer around it — device firmware, rack management code, validation tools, and the operational process for pushing one patch across thousands of nodes.
No, and the difference is the whole procurement argument. Interoperability is a narrower condition: an interface specification exists, a connector matches, a certification passes, a partner can ship a board into a rack. A supplier may license an interface while retaining exclusive control over firmware signing, build keys, validation suites or runtime compatibility notes. NVLink Fusion is described in the Korean report as extending NVIDIA's open infrastructure platform to custom XPUs, letting chipmakers pair specialized silicon with NVIDIA scale-up networking and established infrastructure. That supports performance, lower deployment risk and shorter time to market. It does not state who repairs a rack when the original vendor is absent, and it does not show that a third team can rebuild, sign and validate a critical firmware image without original vendor materials.
Alpinum Consulting makes the adjacent verification point in its Huawei Ascend 960 case: sign-off has to cover interconnect, memory, firmware, runtime software and fault handling, not the chip alone. The same logic appears in equipment orders versus process readiness for memory makers: a purchase confirms access to a tool, not the capability to run it.
| Layer of claim | What it genuinely proves | What it does not answer | Test that settles it |
|---|---|---|---|
| Interoperable | Interface spec exists; a board or XPU passes electrical, protocol or partner checks | Whether anyone other than the designer can ship a working image | Clean-machine build from deposited artifacts |
| Open platform | Third parties may design against the platform under license | Who holds signing keys, build keys and compatibility notes | Independent re-sign of a patched firmware release |
| Vendor-supported | A support contract is live at signature time | What happens after expiry, acquisition or exit from a market | Support-continuity walkthrough with a named trigger |
| Escrow-backed | Artifacts are lodged with an agent under stated release conditions | Whether dependencies are complete and the result is deployable | Rebuild, patch and workload-resume test, audited |
A useful deposit is not a sealed source folder. It is the ability to build, sign, patch and validate after a defined trigger. Firmware and microcode come first, because interconnect faults and rack-level failures usually live below user applications. Configuration artifacts follow, because topology, accelerator mapping, cooling, power and failure-isolation rules decide whether a cluster runs at all. Toolchain and runtime close the set: images, compilers, libraries, profilers and compatibility notes are what keep training or inference workloads alive.
Each artifact should be tested against a failure scenario rather than inventoried. What happens when a supplier stops issuing updates, when a support certificate expires, or when a security flaw demands a firmware patch and no one at the original vendor can sign a new image? If the contract only records that files were received, it has documented storage, not maintenance. An escrow that cannot be rebuilt is a legal comfort item. The buyer needs a named auditor, explicit release conditions, evidence of a clean build, and a route to apply patches when the supplier cannot respond. Verification is treated as its own paid discipline in the escrow industry: agents such as Escode describe checks of whether a deposit is complete, readable, re-buildable and maintainable, separate from storage of the files themselves.
Financial regulation already uses this grammar, which is why the hardware gap looks odd. Under PRA Rulebook SS2/21, firms must document and test exit plans for material outsourcing arrangements, and the EU's DORA regime has applied since 17 January 2025. Boards accept that a critical service needs a rehearsed exit. A production accelerator cluster of the same criticality is often bought on a datasheet and a support hotline.
The strongest counter-case is that escrow manufactures false confidence. A buyer can require a deposit without checking whether dependencies are listed, whether build keys can be replaced, whether third-party code may be redistributed, whether the archive compiles on a clean machine, or whether a support engineer can reproduce a live production failure. A stale archive satisfies a contract and fails during an incident. That critique bites because real procurement lets schedules, legal clauses and file lists finish faster than engineering tests.
Suppliers have a legitimate objection too. Escrow adds governance work: copied firmware, build scripts, keys and configuration data need controlled storage, review and release processes. It can expose trade secrets beyond a limited-use license. It burdens smaller accelerator makers without legal and verification teams, while incumbents absorb the cost. Poorly drafted clauses can turn into bargaining leverage rather than maintenance tools. So the burden of proof falls on a narrow, testable escrow design, not on the existence of escrow as a concept.
| Common misconception | What the cases and practice actually show |
|---|---|
| A sealed folder of source equals continuity | Continuity requires build keys, dependencies, signing rights and a rehearsed release path |
| Certification or an audit badge covers support risk | Certification proves conformance at one date; the repair path is a separate test |
| Transparency pledges fix engineering dependency | OpenAI's data center commitments change disclosure practice, not who signs a patch |
| Escrow costs fall evenly on suppliers | Small XPU designers carry disproportionate legal and verification load |
| Buying the asset buys the maintenance right | Siemens' turbine case shows service loops can be severed by a third jurisdiction |
Public commitments in the wider AI data center market confirm that transparency and repair are different categories. A Bianews report says OpenAI announced new commitments for communities around its data center projects, including ending the use of non-disclosure agreements with local government officials except for narrowly defined security, trade secret or commercially sensitive information. The report says OpenAI plans to pay for its own electricity and supporting infrastructure costs, publish projected jobs and hiring, and include local commitments in agreements for each compute campus it owns and operates, and that Amazon made a similar non-disclosure commitment in October. Those steps answer local accountability. If a cluster depends on signed firmware, proprietary rack controllers or a vendor-specific validation suite, a pledge to reduce local non-disclosure practices does not change who can issue a patch. Openness must be defined at the layer where support happens: a community may read a specification yet still lack the keys to rebuild a signed runtime; a regulator may see a project name yet still lack the failure evidence needed to keep production workloads running.
Three reversals define the boundary of the rule. First, when an open interconnect stack is maintained by an independent body with conformance testing, public drivers, reproducible firmware, certification and patch governance, escrow becomes optional insurance. Real examples exist at the management layer: OpenBMC, a Linux Foundation project since 2018, provides an open baseboard management controller firmware stack across heterogeneous systems, and the TianoCore community maintains an open implementation of the UEFI firmware interface. Where such a stack is genuinely in use, the rebuild path belongs to a community rather than one design authority.
Second, when escrow terms are so broad that they deter suppliers without improving rebuildability, buyers pay in cost, delay and reduced choice. Third, when a deployment is short-lived, experimental or isolated from production, the operational value may be low enough that contract simplicity wins. The argument is about production dependency, not universal software ownership.
Ten-year view for the decision layer: the market is moving from single-supplier racks to assembled systems, so the commercial question must eventually cover maintenance when one authority cannot respond. A rack that speaks the language of an interconnect platform still needs a support plan for the day the interpreter disappears — and the only clause worth signing is the one somebody has already tested on a clean machine.
Written by Isla Sanders for GlobalBizSight SectorDeepDives.
No. Escrow is a conditional licence to use deposited material after defined triggers. Ownership, if it exists at all, is a separate negotiation. The practical question is whether the deposit can be built, signed and deployed, not who holds copyright.
No. The pattern is any multi-vendor production rack where firmware signing, validation suites or rack management code stay with one party. The Korean Rebellions–NVIDIA–SK Telecom build is a clear illustration precisely because it combines custom silicon, a scale-up interconnect description, a rack architecture and a national operator.
Costs are not published per rack, so treat this as analysis rather than quoted fact: the spend concentrates in third-party verification services, storage and review governance, and engineering time to reproduce a clean build — the same categories suppliers cite when they object.
The UK cloud remedies of July 2025 and March 2026 suggest not. Regulatory action there addressed switching friction, egress pricing and interface terms. Rebuildability of a signed stack was not the remedy being ordered.
Where an independent body truly maintains the stack with public drivers, reproducible firmware, conformance testing and patch governance, escrow becomes optional insurance. Where the standard is open but the signing keys are not, the gap remains.