Case File: What Melilla and DK-NFLNK Reveal About the Second-Life Pack Record | GlobalBizSight SectorDeepDives

Here is the paradox at the centre of second-life batteries: a pack holding nearly 70% of its capacity can still be impossible to price. The missing input is not chemistry or wiring, but a health record that outlives the vehicle. This SectorDeepDives case file reaches a narrow conclusion: require the pack-level record now, and leave the intra-pack radio link alone while the measurement layer is still being redesigned.

That is a sequencing bet, not a comfort blanket. It says the binding constraint on retired packs is informational, and that the layer hardest to retrofit — the sealed high-voltage interface — is the one we should be slowest to freeze in regulation. The rest of this case file tests that claim against one field deployment, one sampling product and the emerging access rules, then states plainly what would prove it wrong.

Why does a pack with 70% capacity left still fail to sell?

Conclusion: because the only health number attached to it cannot be checked by the buyer. A fleet retiring an electric bus has to clear two ledgers at once. The first is emissions reporting: end-of-life handling of sold products sits in Scope 3, the indirect bucket of a corporate inventory covering suppliers and everything after the factory gate. The second is a resale or reuse price that a buyer, insurer or auditor can defend. Both ledgers need the same input — a health record that survives the vehicle — and most packs leave service carrying a number only the manufacturer can interpret.

In plain terms, state of health is the percentage of original capacity still available. Without a shared method and an uncertainty band, that percentage is a claim, not a measurement. The EU has chosen to solve the information problem with an electronic record: under Regulation (EU) 2023/1542, from 18 February 2027 each light means of transport battery, each industrial battery above 2 kWh and each electric vehicle battery placed on the market or put into service must carry a battery passport. A passport is an access regime before it is a document — the unresolved question is what a third party may query, and on whose terms.

What the engineering actually changed — and what it did not

Conclusion: Dukosi's sampling product improves sensing density and failure modes, but says nothing about who may read the data. Dukosi, an Edinburgh company, has begun commercial sampling of DK-NFLNK, a contactless intra-battery communication system that carries cell voltage and temperature readings over a single bus antenna instead of copper wiring, as GreencarbonWorld reported from the Pretzl Connect 2026 event in Budapest.

The engineering case is not thin. Joseph Notaro, the company's president, put connector failure rates in a conventional harness at around 10 parts per million, and said that in automotive and industrial settings where reliability is measured at parts-per-billion level, that rate is too high and an unacceptable risk of failure. On heat, the same GreencarbonWorld report has Notaro saying that with sparse temperature sensing a failing cell can take 10 to 15 minutes to warm an external sensor, while sensing on every cell catches an excursion before it reaches neighbours. Dukosi also claims consistent cell-level data can let operators trim safety buffers and raise usable energy by 6% to 12%, and that each cell carries its own digital passport on chip — maximum temperature seen, voltage history, total charge cycles.

None of that settles access. A wired management system can be as opaque as a wireless one, and copper does not make a protocol open. Swapping a harness for radio changes failure modes and sensor density; who gets to read the numbers is a separate arrangement. Dukosi frames DK-NFLNK as one step on a migration path, built with its full cell-monitoring system on the same C-SynQ communication platform. A rule written now would certify an interface the vendor expects to be superseded. This is a vendor description of a product now sampling, not an audited result, and I treat it accordingly.

Where does the lock-in really sit?

Conclusion: in the chip-level record and in the tool that opens it. Dukosi's account has recyclers and integrators reading the chip to establish cell health and sort packs for grid use or recycling — but it leaves out the reader, the licence and the permission model. That omission is the whole commercial question. The same issue appears wherever a manufacturer retains the diagnostic key: a closed service path transfers pricing power to the party that can read the pack, every time it changes hands.

The regulatory clock has its own schedule and its own ambiguities. Regulation (EU) 2023/1542 sets 18 February 2027 as the date from which the relevant categories must have an electronic record. What happens at end of life is now being drafted: under the 2026 draft rules discussed by Minespider, Article 77(7) moves responsibility for keeping the passport accurate to the producer, its producer responsibility organisation or the waste operator once the battery's status changes to waste, and treatment operators and recyclers get access through tiered rights. How "legitimate interest" is checked is still open. In other words, the access regime is being written while the hardware is still moving — the opposite of a stable target for a mandate.

The strongest case against waiting — and why it still falls short

Conclusion: the retrofit risk is real and I concede it; the remedy proposed is still aimed at the wrong layer. Interfaces that ship before a rule exists tend to become the rule. DK-NFLNK is sampling in 2026, packs built around it will be in service years before anyone writes a conformance test, and sealed high-voltage hardware is close to impossible to retrofit with a read port afterwards. An access requirement written later would govern a generation already sent for shredding. Reading a record at the pack terminals after disassembly loses the cell-level detail that made it worth keeping, so pack-level access is not a full substitute.

The second leg is about value. Peak cell temperature, voltage history and cycle count are the fields that decide residual value, insurance terms and whether a pack is safe to install under a school. Held behind one vendor's tool, those fields shift value from the independent grader or repairer to the manufacturer at each handover. That shift is the real fight, not the radio.

What I will not accept is a mandate on the intra-pack link today. First, there is no agreed definition of what a state-of-health figure means or how wide its uncertainty band should be; freezing a number nobody can reproduce produces certified dead ends. A 2026 study posted on arXiv found that battery-health figures reported by on-board BMS often fail independent validation, and that SoH varies in meaning and availability across manufacturers — a buyer comparing models cannot make a like-for-like comparison. Grading cutoffs diverge too: a widely used three-tier scheme sorts at above 80%, 50–80% and below 50%, while many automakers use 80% as the nominal end-of-life for mobility and some allow use down to 70%. Second, the security objection is substantive: a general-purpose reader able to interrogate cells inside a live high-voltage pack is an attack surface, and nobody has costed the safety duty that comes with it. Authentication there is a safety control. Regulation 2023/1542 already establishes an access regime; a second one bolted onto the hardware layer would duplicate the first and add failure points.

What the record is worth — and who captures the margin

Conclusion: the same 6% to 12% usable-energy gain is distributed differently depending on who can read it, and the grading bottleneck decides how much of it survives to a buyer. Take that figure at face value. Behind one vendor's tool, the margin is captured in warranty, certified resale and the manufacturer's own second-life programme. Readable by any licensed grader, it spreads across every integrator able to price a pack. Same cells, different distribution of the gain.

Scale is not the constraint. IDTechEx forecasts the second-life EV battery market at US$4.2B by 2035, and the Electric School Bus Initiative reports that retired electric school bus packs still hold nearly 70% of their capacity. The constraint is grading: every pack that arrives without a trustworthy history must be cycled on a tester before an insurer or buyer will touch it, consuming equipment hours plus the labour of rigging a high-voltage pack safely.

Consider the process, because it is instructive. The Nissan–Enel Second Life installation at Endesa's Melilla plant — a plant serving a grid-isolated city of almost 90,000 people — was built from 78 packs: 48 used Nissan LEAF batteries and 30 new ones, rated at 4 MW and 1.7 MWh, able to feed the grid for around 15 minutes if the main plant disconnects. The instructive step is that packs went in essentially in their original form, without module teardown and repack, because their provenance was known; the 30 new packs doubled as a control sample to track how the used units degraded in service. The reusable lesson is not that second life works — it is that whole-pack reuse becomes financeable when the operator can already identify what each pack is. Where provenance is missing, the economics invert.

That gap is widely felt. Gaia Diletta Pivari, a strategic development and innovation specialist at Erion, put it plainly in the RECIRCULATE project: "Europe lacks the necessary infrastructure to test and evaluate the remaining lifespan of end-of-life batteries… refurbishment operators are not widespread and often do not collaborate with PRO networks," with standardised testing protocols and minimum performance requirements still missing. Consumer-side evidence points the same way: a US NIST study on consumer valuation of battery health information in used EV markets treats the lack of transparent, standardised health information at point of sale as a source of undervaluation, and market trackers link slow SoH standardisation to depressed residual values. Carbon accounting will not create the incentive by itself — Scope 3 reporting still leaves a pack needing a price a buyer can recover. The money rewards whoever can grade fastest and cheapest. Forum threads on r/batteries and a Hacker News discussion of used packs raise the missing-standard-data complaint from a buyer's angle; they are not survey evidence and I would not build a case on them. The 2024 reviews by Patel et al. in Frontiers in Chemistry and by Song et al. in Energies cover the technical ground in more detail.

Cell-level mandate now, or pack-level record now?

Conclusion: the pack-level record wins on every criterion except long-run completeness, which is why it is the right first move.

CriterionCell-level readout mandate nowPack-level health record now
Maturity of what is mandatedInterface still being redesigned; no conformance testDefined field set can be specified and tested
Retrofit exposureSealed HV hardware near-impossible to retrofitReadable after disassembly
Who captures the marginManufacturer's tool and licenceAny licensed grader or integrator
SoH definition riskFreezes an unreproducible numberRequires method plus uncertainty band
Standardisation statusProprietary, sampling in 2026Aligned to 18 February 2027 passport
Security surfaceAdds a live-pack reader and new duty of careNo new hardware attack surface

Three common misreadings

Conclusion: most arguments for an immediate hardware rule rest on one of four errors.

  • Wireless is the problem; wired is open. Copper does not make a protocol open. Opacity is a permission model, not a transmission medium.
  • One SoH number is a health record. Without the method and an uncertainty band, the number is a claim. Independent testing shows reported SoH is not comparable across makers.
  • Pack-level access fully replaces cell-level data. It does not. Terminal reading after disassembly loses cell detail; the pack record is a first step, not the endpoint.
  • Scope 3 reporting will pay for grading. It will not. End-of-life accounting creates a disclosure duty, not a buyer; recovered pack value must fund the test.

What to do — and the trigger that would reverse the call

Conclusion: act through procurement and test benches this year; keep the hardware lever in reserve. What I would support now is a minimum health record at pack level: state of health with the method behind it and an uncertainty band, peak temperature seen, cycle count, and resting cell-voltage spread — machine-readable, tiered by role, readable after disassembly, with conformance tests and no licence fee for read-only access once the pack has left the vehicle. The intra-pack physical layer can stay proprietary while it is still being redesigned.

  1. Write read access into bus and truck tenders this year, while the regulation is still in draft. A bus tender that requires a machine-readable health record, queryable without a vendor licence once the vehicle leaves service, changes procurement inside one contract cycle; manufacturers answer tenders faster than consultations.
  2. Fix the minimum field set and its uncertainty band, then test both on packs already in service rather than on new ones.
  3. Fund a reference bench so a health number can be checked against something other than the seller's own tool.
  4. Leave the intra-pack link alone until chip-on-cell architectures settle, then revisit with retrofit cost data.

If the passport deadline arrives and an independent grader still cannot obtain a number it can insure without the manufacturer's permission, the sequencing argument above collapses and a hardware mandate becomes the remaining option. Better to write that trigger down now than to assume the softer route will hold. The first step costs a procurement team a few weeks of attention and depots are buying buses this year regardless; the last costs nothing, which is usually the one that gets skipped.

FAQ

Is a pack-level record enough to price a second-life battery?

Not alone. It removes the need to re-test every pack from scratch, but a buyer still needs the method, uncertainty band and a reference bench to trust the number. The record is the entry ticket, not the valuation.

What should a minimum pack health record contain?

State of health plus its measurement method and uncertainty band, peak temperature seen, cycle count, and resting cell-voltage spread, in a machine-readable format that survives disassembly and allows read-only access without a licence fee after the vehicle is retired.

When does the EU battery passport become mandatory?

From 18 February 2027 under Regulation (EU) 2023/1542, for light means of transport batteries, industrial batteries above 2 kWh and electric vehicle batteries placed on the market or put into service.

Why not mandate open cell-level readout now?

Because the interface is still being sampled and expected to change, sealed hardware is hard to retrofit, there is no reproducible SoH definition, and a live-pack reader adds a security duty. Mandating it would freeze an unsettled layer.

What would prove this sequencing argument wrong?

If, after the passport deadline, an independent grader still cannot obtain an insurable health number without manufacturer permission, the softer route has failed and a hardware mandate becomes the remaining lever.

For investors, one reminder: underwrite the grading layer, not the headline battery capacity. The second-life thesis only converts to cash where an independent party can read, test and insure a pack cheaply; until then, a 70% capacity figure is an engineering fact, not a margin.

References

  • European Commission — Digital Product Passport: Batteries
  • GreencarbonWorld: Dukosi Starts Sampling DK-NFLNK to Replace Battery Wiring With Near-Field RF
  • Enel: Second Life storage system for used electric car batteries, Melilla, Spain
  • Nissan: partners with Enel on Second Life storage system, 48 used LEAF and 30 new packs
  • arXiv: Battery health reporting fails independent validation across models
  • NIST: Consumer Valuation of Battery Health Information in Used Electric Vehicle Markets
  • Minespider: Battery Passport Access Rights under the 2026 draft rules
  • RECIRCULATE: Circularity in Europe — the case for a second-life marketplace
  • IDTechEx: Second-life Electric Vehicle Batteries 2025-2035
  • Electric School Bus Initiative: Building a Market for Second-Life Electric School Bus Batteries
  • Frontiers in Chemistry: Lithium-ion battery second life, pathways, challenges and outlook
  • Energies: An Overview About Second-Life Battery Utilization
  • r/batteries: Outside of range, what is the biggest hidden obstacle
  • Hacker News: The Used-Battery Gold Rush Is Coming
Brand logo

Global Biz Sight

Global business intelligence — turning scattered data into clear, actionable decisions.

Global MarketsSector DeepDivesCompany WatchMarket EntryData StoriesGlobal SaaSManager

© 2026 GlobalBizSight.

Cookie Notice

We use cookies to improve your experience and analyze website traffic. Read our Privacy Policy to learn more.